Reimagining Temporary Infrastructure: Hilo Wastewater Treatment Plant Project

When critical municipal facilities like the Hilo Wastewater Treatment Plant undergo rehabilitation, maintaining operational continuity requires more than just temporary buildings. It requires a high-performance access strategy that mirrors the speed of modular construction. By treating ramps and walkways as engineered infrastructure rather than site-built afterthoughts, project teams can eliminate the delays associated with concrete or custom steel. This approach ensures that temporary campuses remain fully compliant, safe, and adaptable throughout every phase of a multi-year transition.

Key Takeaways

  • Modular access systems provide a middle ground between flimsy temporary ramps and permanent concrete, offering the durability of a fixed structure with the speed of rapid deployment.
  • Utilizing non-penetrating designs and adaptive leveling legs allows for installation on existing surfaces without the need for time-consuming foundation work or specialized subcontractors.
  • Engineered components with slip-resistant grating are essential for maintaining safety and ADA compliance in harsh, high-moisture coastal environments where standard materials often fail.

Bridging the Access Gap: Modular Infrastructure as a Strategic Asset in High-Stakes Utility Projects

Hilo is known for its cultural richness and dramatic landscapes, but behind the scenes, its wastewater infrastructure performs the critical task of treating roughly 3 million gallons of water each day for about 30,000 residents. Nan Inc had to develop a plan to relocate essential personnel to a temporary campus without derailing operations during rehabilitation efforts. 

These temporary structures – modular buildings arranged to support administrative and operational continuity – needed to be quickly deployed and relocatable for future use throughout the course of rehabilitation. Nan Inc adopted modular techniques to quickly design, build, and deliver for immediate use. That’s when they encountered a major problem – establishing accessibility in a rapidly deployed temporary environment that required expertise well outside of their capabilities. 

Traditional site-built access solutions, such as poured-in-place concrete or custom-fabricated steel ramps, were immediately ruled out due to cost, long lead times, and the difficulty of adjusting them as the project evolved. Likewise, the team noted that light duty aluminum ramps lacked stability, slip resistance, and reliability needed for daily, long-term use in a wet coastal climate, let alone the durability to relocate with the buildings down the road. 

The Challenge: A Compliance-Driven, Fast-Moving Environment 

Nan Inc required an access system that was fully ADA and building code compliant, structurally robust, and flexible enough to integrate seamlessly with the modular buildings planned for the site. The system also needed to be assembled efficiently by onsite personnel with minimal disruption. The challenge was not only technical, but also logistical. Nan needed to deliver: 

  • A complete, code compliant access route between modular units. 
  • A solution that could be rapidly engineered, approved, shipped to Hilo, and installed with only limited on-island support. 
  • A design that would withstand environmental exposure and heavy use. 
  • A system flexible enough to change along with the construction phasing. 

Modular Access as Infrastructure 

Nan Inc. required an access system that mirrored the benefits of the modular buildings themselves: pre-engineered, scalable, and rapidly deployable. The chosen solution was RightWay Pro, a modular walkway, stair, and ramp system engineered for rapid deployment and long-term durability. Though modular access systems are often associated with simple temporary use cases, the Hilo project illustrates how they can act as strategic infrastructure – bridging the gap between permanent and temporary construction. 

The design process focused on clarity and adaptability. Using pre-engineered components, the access system was configured to match site elevations, distances between structures, and required turning space. These elements were refined in days rather than weeks, critical in an active construction environment where schedules shift quickly. 

Once approved, the full system was shipped to Hilo and installed with onsite personnel. No specialized subcontractors or complex fabrication steps were necessary. The universal modules arrived ready to assemble into walkway, ramp, and stair structures, providing predictable installation time-frames that fit the project’s tight schedule. 

Field Experience: A OneWeek Transformation 

One of the most defining characteristics of this project was speed. Within just one week of starting installation, the temporary campus had a fully functional access system connecting multiple modular buildings. Crews were able to continue their work without navigating unsafe or improvised walkways, improving safety even during construction. 

The system’s slip-resistant FRP grating proved particularly important in Hilo’s rainy climate. Workers noted the increased stability underfoot compared to aluminum alternatives, which can become slick when wet or degrade more quickly in coastal environments. 

Equally important was the non-penetrating design, with the access system secure through weight and geometry alone. The adaptive leg system allowed for adjustments in the field for a reliable, level walking surface. This supported the need for rapid deployment by avoiding extensive, time consuming concrete work underneath the system. 

Benefits to the Project Team 

By treating the access system as a modular component of the total solution instead of a site-built afterthought, Nan Inc. realized several strategic advantages: 

  • Compressed Timelines: Design revisions took days, ensuring the campus was operational without delaying the broader rehabilitation schedule. 
  • Self-Performance Efficiency: The system’s “ready-to-assemble” nature allowed the onsite team to handle installation, eliminating the need for specialized subcontractors. 
  • Dynamic Adaptability: As the plant rehabilitation moves through different phases, the modular components can be disassembled and reconfigured, turning a project expense into a relocatable asset. 
  • Military-Grade Durability: Built to exceed the lifespan of the temporary project, the hardware remains available for reuse across future municipal sites. 

Lessons for Modular Construction Practitioners 

The Hilo project underscores the growing role of modular infrastructure. Not only for buildings, but for the systems that make those buildings usable. Key takeaways include: 

  • Temporary does not mean low performance. Modular access delivers performance comparable to permanent construction. 
  • Pre-engineered systems accelerate timelines. Where traditional design cycles can cause delay, modular repetition and predictability enable fast movement. 
  • Modularity supports adaptive phasing. As projects evolve, access systems that can move with them enable more efficient workflows. 
  • Safety should remain central, even in temporary conditions. The ability to meet ADA and building code standards quickly is critical in municipal and industrial environments. There is no provision for avoiding these requirements in temporary applications. 

As municipalities modernize critical infrastructure, projects like the Hilo Wastewater Treatment Plant rehabilitation reveal how temporary environments must rise to the same standards of accessibility, safety, and reliability as permanent facilities. Nan Inc’s approach to constructing a safe, flexible, and rapidly deployable access campus demonstrates how modular systems can function as essential infrastructure during long-term upgrades. 

This project illustrates a larger shift taking place across the construction industry, where modularity, speed, and resilience increasingly shape the way temporary and permanent environments are designed, built, and experienced. 

Your Trusted Partner for Industrial Access Solution

At FlexDecks, we specialize in turning complex safety challenges into simple, elegant, and effective solutions. Our modular platforms and walkways are designed to be durable, low-maintenance, and easily adaptable to your changing needs. As this case study demonstrates, we provide more than just a product—we provide peace of mind, with expert design and support that empower your team and protect your people.

Ready to replace your unsafe walkways with a secure, custom-engineered solution? Contact FlexDecks today for a consultation and a free quote. 📞


Frequently Asked Questions

Q: Why was a modular access system chosen over traditional poured-in-place concrete for the Hilo project?
A: Concrete was ruled out due to high costs, long lead times, and the lack of flexibility. Because the Hilo plant rehabilitation is a phased project, the team needed an access solution that could be rapidly deployed and later reconfigured or relocated as the site layout evolved, which is impossible with permanent masonry.

Q: How does a non-penetrating design benefit a fast-moving infrastructure project?
A: A non-penetrating system stays secure through its own weight and geometry rather than being anchored into the ground. This avoids the need for extensive site preparation or damage to existing pavement, allowing the onsite team to achieve a level, code-compliant walking surface in a fraction of the time required for traditional construction.

Q: What role does material choice play in the reliability of temporary access systems in coastal climates?
A: Standard light-duty aluminum can become slick and lose stability in wet, salty environments like Hilo. The RightWay Pro system uses FRP grating and robust components that provide superior slip resistance and corrosion protection, ensuring the walkways remain safe for heavy daily use by operational personnel over the long term.

Q: Can an onsite construction crew handle the installation of these systems without specialized training?
A: Yes. The system is designed to be ready-to-assemble, which allowed Nan Inc to use its own personnel for the installation. This self-performance efficiency eliminated the need to coordinate with outside subcontractors, contributing to the one-week transformation of the campus from a collection of isolated units into a connected, functional facility.